Parking lot greening turf
The construction period is as short as 1 day! No alternative land is needed, and it features unique parking lot greening panels with excellent strength and durability.
The "Parking Lot Greening Specialty Turf" can be used as early as the next day. In addition to approximately 30% cost reduction, the construction period is significantly shortened, so there is no need to prepare alternative land. Therefore, you can easily green your parking lot without removing the pavement. 【Features】 ■ Excellent strength and durability ■ Load capacity for vehicles under 10 tons, total load under 20 tons ■ Uses turf that has been cured for 5 months at our own curing farm ■ Effective for increasing green space and suppressing high temperatures ■ Almost no watering needed (only watering required during two weeks of sunny weather in summer) *For more details, please refer to the PDF document or feel free to contact us.
- Company:不動
- Price:Other